Show simple item record

dc.contributor.authorCole, Grahameen_US
dc.contributor.authorO'Halloran, Kelvinen_US
dc.contributor.authorStewart, Rodneyen_US
dc.date.accessioned2017-05-03T13:02:54Z
dc.date.available2017-05-03T13:02:54Z
dc.date.issued2011en_US
dc.date.modified2011-09-27T06:57:22Z
dc.identifier.urihttp://hdl.handle.net/10072/40926
dc.description.abstractWater utilities undertake long term planning for water source security, often with forecast cycles of 20 to 30 years. Whilst this planning is generally involved with investigations of source water abstraction security and the need to build dams or to increase the recharge rate of groundwater aquifers, planning for water efficiency gains occurs at annual intervals. Most water utilities in Australia are heavily engaged in water efficiency initiatives with rebate schemes for domestic water-efficient devices ubiquitous across the industry. Wide Bay Water Corporation (WBWC) also engages in these activities but is increasingly interested in the concept of Time of Use Tariffs (TOUT) to target high water users in order to reduce their demand on the system. In 2006, WBWC introduced smart metering technology across the city which captures hourly use data. Interrogation of this data has lead to the ability to identify water use patterns for every domestic and commercial water customer and to design specific interventions to encourage water efficiency, such as a TOUT for domestic customers. A TOUT has been developed that imposes a penalty on all individual consumption greater than 600L in any hourly interval of any day in the year. The tariff was designed to reduce both the annual maximum peak hour demand and annual maximum day consumption. The ability to reduce both of these infrastructure design parameters has the potential to deliver substantial savings in infrastructure planning and deployment. This paper details the design process of this tariff, examines the infrastructure savings potential derived by network modelling explores and the regulatory framework engagement hurdles to be overcome in order to implement such tariffs in the water industry.en_US
dc.description.publicationstatusYesen_AU
dc.languageEnglishen_US
dc.language.isoen_AU
dc.publisherInternational water Associationen_US
dc.publisher.placeJordanen_US
dc.publisher.urihttp://www.iwahq.org/q1/events/iwa-events/2011/the-6th-iwa-specialist-conference-on-efficient-use.htmlen_AU
dc.relation.ispartofstudentpublicationNen_AU
dc.relation.ispartofconferencenameThe Sixth IWA Specialist Conference on Efficient Use and Management of Wateren_US
dc.relation.ispartofconferencetitleThe Sixth IWA Specialist Conference on Efficient Use and Management of Wateren_US
dc.relation.ispartofdatefrom2011-03-29en_US
dc.relation.ispartofdateto2011-04-02en_US
dc.relation.ispartoflocationDead Sea, Jordanen_US
dc.rights.retentionYen_AU
dc.subject.fieldofresearchEnvironmental Managementen_US
dc.subject.fieldofresearchWater Resources Engineeringen_US
dc.subject.fieldofresearchcode050205en_US
dc.subject.fieldofresearchcode090509en_US
dc.titleTime of use tariffs: implications for water efficiencyen_US
dc.typeConference outputen_US
dc.type.descriptionE2 - Conference Publications (Non HERDC Eligible)en_US
dc.type.codeE - Conference Publicationsen_US
gro.date.issued2011
gro.hasfulltextNo Full Text


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

  • Conference outputs
    Contains papers delivered by Griffith authors at national and international conferences.

Show simple item record