Show simple item record

dc.contributor.convenorASABE and AEEGen_US
dc.contributor.authorSo, Bingen_US
dc.contributor.authorKhalifa, Ashrafen_US
dc.contributor.authorCarroll, Chrisen_US
dc.contributor.authorGhadiri, Hosseinen_US
dc.contributor.authorYu, Bofuen_US
dc.contributor.editorD.C. Flanagan, J.C. Ascough II, and J.L. Nieberen_US
dc.date.accessioned2017-05-03T11:33:56Z
dc.date.available2017-05-03T11:33:56Z
dc.date.issued2011en_US
dc.date.modified2012-08-26T22:53:13Z
dc.identifier.urihttp://hdl.handle.net/10072/46515
dc.description.abstractOpen-cut coal mining in Central Queensland involves the breaking up of overburden, generally of Permian origin, that overlies the coal seams using explosives, followed by removal with draglines which results in the formation of extensive overburden spoil-piles with steep slopes at the angle of repose. These spoil-piles form long multiple rows, with heights of up to 60 or 70 m above the original landscapes. They are generally highly saline, dispersive and highly erosive. Legislation requires that these spoil-piles be rehabilitated into a stable self sustaining ecosystem with no off-site pollution. In contrast to agricultural ecosystems where slope gradient is a fixed characteristic of the landscape, the first stage in the rehabilitation of these landscapes is the modification and lowering of slopes to create a landscape that is stable against geotechnical failure (landslides) and erosion. This is followed by revegetation with rapidly establishing grasses as pioneer vegetation to further reduce erosion, and an appropriate mixture of native shrubs and trees which are slower to establish. Excessive erosion and on-site discharges of sediment into mine working areas may result in the temporary cessation of mining operation with significant financial consequences, while off site discharges may breach the mining lease conditions. The average cost of rehabilitation is high (average of $ 22,000/ha) and with approximately 100,000 ha of spoil-piles in Queensland at present, the total cost of rehabilitation facing the industry is very high. Most of this comprised the cost of reshaping the landscape, associated with the large amount of material movement necessary to achieve the desired landscape. Since soil and spoil-piles vary greatly in their erodibilities, a reliable and accurate methodology is needed to determine cost effective combinations of slope length, slope gradient and vegetation that will result in acceptable rates of erosion. This paper reports on the development of a set of two user friendly computer packages, MINErosion 3.1 and MINErosion 4.1 that were designed to assist minesites to achieve stable postmining landscape reconstruction that will result in acceptable rates of erosion. MINErosion 3.1 is a user friendly predictive hillslope computer package useful in the selection of suitable combinations of landscape design parameters (slope gradient, slope length and vegetation cover) that will result in acceptable rates of erosion. The slope length and gradient are parameters required by the mining companies as inputs into their landscape design software to cost effectively construct suitable landscapes that will meet the required erosion criteria. MINErosion 3.1 predicts with reasonable accuracy, both the annual average soil loss under the prevailing climatic conditions as well as the potential erosion from individual rainstorms with known annual recurrence intervals. A database of 35 soils and spoils from Central Queensland are imbedded in the model. MINErosion 4.1 is a user friendly catchment/landscape based predictive erosion package useful in the estimation of erosion rates (mean annual or individual rainstorm) from the proposed reconstructed postmining landscape. It combines MINErosion 3.1 with Arc-Gis v9. The outputs are maps of erosion and deposition on the landscape as well as discharges from the catchment/landscapes.en_US
dc.description.publicationstatusYesen_US
dc.languageEnglishen_US
dc.publisherAmerican Society of Agricultural and Biological Engineers (ASABE)en_US
dc.publisher.urihttp://www.asabe.org/meetings-events/2011/09/2011-international-symposium-on-erosion-and-landscape-evolution.aspxen_US
dc.relation.ispartofstudentpublicationNen_US
dc.relation.ispartofconferencenameInternational Symposium onErosion and Landscape Evolutionen_US
dc.relation.ispartofconferencetitleCD-ROM Proceedings of International Symposium on Erosion and Landscape Evolutionen_US
dc.relation.ispartofdatefrom2011-09-18en_US
dc.relation.ispartofdateto2011-09-21en_US
dc.relation.ispartoflocationAnchorage, Alaska, USAen_US
dc.rights.retentionYen_US
dc.subject.fieldofresearchSoil Physicsen_US
dc.subject.fieldofresearchcode050305en_US
dc.titleTools for designing post-mining landscapes with acceptable erosion risk and discharges on the receiving environmenten_US
dc.typeConference outputen_US
dc.type.descriptionE2 - Conference Publications (Non HERDC Eligible)en_US
dc.type.codeE - Conference Publicationsen_US
gro.facultyGriffith Sciences, Griffith School of Environmenten_US
gro.date.issued2011
gro.hasfulltextNo Full Text


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

  • Conference outputs
    Contains papers delivered by Griffith authors at national and international conferences.

Show simple item record