• myGriffith
    • Staff portal
    • Contact Us⌄
      • Future student enquiries 1800 677 728
      • Current student enquiries 1800 154 055
      • International enquiries +61 7 3735 6425
      • General enquiries 07 3735 7111
      • Online enquiries
      • Staff phonebook
    View Item 
    •   Home
    • Griffith Research Online
    • Journal articles
    • View Item
    • Home
    • Griffith Research Online
    • Journal articles
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

  • All of Griffith Research Online
    • Communities & Collections
    • Authors
    • By Issue Date
    • Titles
  • This Collection
    • Authors
    • By Issue Date
    • Titles
  • Statistics

  • Most Popular Items
  • Statistics by Country
  • Most Popular Authors
  • Support

  • Contact us
  • FAQs
  • Admin login

  • Login
  • Maintenance Decisions for Inground Decay of Power-Supply Timber Poles

    Author(s)
    Rahman, Anisur
    Chattopadhyay, Gopi
    Hossain, M Jahangir
    Griffith University Author(s)
    Rahman, Anisur
    Year published
    2016
    Metadata
    Show full item record
    Abstract
    Timber poles are widely used for distributing electricity in rural areas, mainly in developing countries. The improved reliability of timber poles is extremely important as the breakdown or failure of any one of these poles can result in millions of dollars in lost revenue and restoration costs. The losses can include production loss, loss of property, or even loss of life. The reliability of such poles depends on a complex combination of age, usage, durability of timber, environmental factors influencing the deterioration process, and most important, maintenance actions carried out through the lifecycle of the poles. This ...
    View more >
    Timber poles are widely used for distributing electricity in rural areas, mainly in developing countries. The improved reliability of timber poles is extremely important as the breakdown or failure of any one of these poles can result in millions of dollars in lost revenue and restoration costs. The losses can include production loss, loss of property, or even loss of life. The reliability of such poles depends on a complex combination of age, usage, durability of timber, environmental factors influencing the deterioration process, and most important, maintenance actions carried out through the lifecycle of the poles. This paper focuses on developing an optimal maintenance model that predominantly captures the inground decay of timber poles, and on developing a mechanism for measuring these factors. The developed maintenance model is then illustrated with numerical examples. Analysis of failure data shows that most of the failures of timber poles are due to a decrease in timber strength and peripheral dimensions at or below ground level. The results from this research could be useful for maintenance and replacement decisions regarding inground timber components used in the utility, construction, railway, and transportation sectors.
    View less >
    Journal Title
    IEEE Transactions on Power Delivery
    DOI
    https://doi.org/10.1109/TPWRD.2015.2424428
    Note
    This publication has been entered into Griffith Research Online as an Advanced Online Version.
    Subject
    Electrical energy generation (incl. renewables, excl. photovoltaics)
    Publication URI
    http://hdl.handle.net/10072/99121
    Collection
    • Journal articles

    Footer

    Disclaimer

    • Privacy policy
    • Copyright matters
    • CRICOS Provider - 00233E
    • TEQSA: PRV12076

    Tagline

    • Gold Coast
    • Logan
    • Brisbane - Queensland, Australia
    First Peoples of Australia
    • Aboriginal
    • Torres Strait Islander