Modelling wetland connectivity during overbank flooding in a tropical floodplain in north Queensland, Australia

Loading...
Thumbnail Image
File version
Author(s)
Karim, Fazlul
Kinsey-Henderson, Anne
Wallace, Jim
Arthington, Angela H
Pearson, Richard G
Griffith University Author(s)
Primary Supervisor
Other Supervisors
Editor(s)
Date
2012
Size

1013028 bytes

File type(s)

application/pdf

Location
License
Abstract

Hydrological connectivity between floodplain wetlands and rivers is one of the principal driving mechanisms for the diversity, productivity and interactions of the major biota in river-floodplain systems. This article describes a method of quantifying floodinduced overbank connectivity using a hydrodynamic model (MIKE 21) to calculate the timing, the duration and the spatial extent of the connections between several floodplain wetlands and rivers in the Tully-Murray catchment, north Queensland, Australia. Areal photogrammetry and field surveyed stream cross data were used to reproduce floodplain topography and rivers in the model. Laser altimetry (LiDAR)-derived fine resolution elevation data, for the central floodplain, were added to the topography model to improve the resolution of key features including wetlands, flow pathways and natural and artificial flow barriers. The hydrodynamic model was calibrated using a combination of in-stream and floodplain gauge records. A range of offstream wetlands including natural and artificial, small and large were investigated for their connectivity with two main rivers (Tully and Murray) flowing over the floodplain for flood events of 1-, 20- and 50-year recurrence intervals. The duration of the connection of individual wetlands varied from 1 to 12 days, depending on flood magnitude and location in the floodplain, with some wetlands only connected during large floods. All of the wetlands studied were connected to the Tully River for shorter periods than they were to the Murray River because of the higher bank heights and levees on the Tully River and wetland proximity to the Murray River. Other than hydrology, land relief, riverbank elevation and levee banks along the river were found key factors controlling the degree of connectivity. These variations in wetland connectivity could have important implications for aquatic biota that move between rivers and off-stream habitats during floods.

Journal Title

Hydrological Processes

Conference Title
Book Title
Edition
Volume

26

Issue

18

Thesis Type
Degree Program
School
Publisher link
Patent number
Funder(s)
Grant identifier(s)
Rights Statement
Rights Statement

© 2012 John Wiley & Sons, Ltd. This is the pre-peer reviewed version of the following article: Modelling wetland connectivity during overbank flooding in a tropical floodplain in north Queensland, Australia, Hydrological Processes, Vol. 26(18), 2012, pp. 2710-2723, which has been published in final form at http://dx.doi.org/10.1002/hyp.8364.

Item Access Status
Note
Access the data
Related item(s)
Subject

Physical geography and environmental geoscience

Environmental management

Freshwater ecology

Civil engineering

Environmental engineering

Persistent link to this record
Citation
Collections