Determining construction method patterns to automate and optimise scheduling – a graph-based approach
File version
Version of Record (VoR)
Author(s)
Hovhannisyan, Vahan
Xie, Haiyan
Brilakis, Ioannis
Griffith University Author(s)
Primary Supervisor
Other Supervisors
Editor(s)
Date
Size
File type(s)
Location
Online
License
Abstract
Creating quality construction schedules to mitigate delays often relies on experience. The lack of dissemination of historic decision reasoning makes it harder. This study proposes a graph-based method to find the time- and risk-efficient construction method patterns from historic projects to help schedulers improve productivity and accuracy. The method leverages schedule data obtained from a Tier-1 contractor and validates for excavation activities. The results indicate that the most time-efficient excavation activities can be done in 0.6% of total project time. The proposed method can help industry professionals standardise scheduling guidelines and automate the generation of construction schedules for critical subtasks.
Journal Title
Conference Title
Proceedings of the 2021 European Conference on Computing in Construction
Book Title
Edition
Volume
Issue
Thesis Type
Degree Program
School
Publisher link
Patent number
Funder(s)
Grant identifier(s)
Rights Statement
Rights Statement
© 2021 European Council on Computing in Construction. The attached file is reproduced here in accordance with the copyright policy of the publisher. Please refer to the conference's website for access to the definitive, published version.
Item Access Status
Note
Access the data
Related item(s)
Subject
Civil engineering
Applied computing
Construction schedules
construction method pattern
graph-based classification
Persistent link to this record
Citation
Hong, Y; Hovhannisyan, V; Xie, H; Brilakis, I, Determining construction method patterns to automate and optimise scheduling – a graph-based approach, Proceedings of the 2021 European Conference on Computing in Construction, 2021