How would the Rogun Dam affect water and energy scarcity in Central Asia?
File version
Accepted Manuscript (AM)
Author(s)
Ringler, Claudia
Bhaduri, Anik
Jeuland, Marc
Griffith University Author(s)
Primary Supervisor
Other Supervisors
Editor(s)
Date
Size
File type(s)
Location
License
Abstract
The construction of the Rogun Dam in the Amu Darya Basin to increase upstream energy generation creates potential trade-offs with existing downstream irrigation, due to the different timing of energy and irrigation water demands. The present analysis, based on a hydro-economic optimization model, shows that cooperative basin-wide maximization of benefits would lead to large increases in upstream hydropower production and only minor changes in downstream irrigation benefits. However, if upstream stations, including Rogun, are managed unilaterally to maximize energy production, hydropower benefits might more than double while irrigation benefits greatly decrease, thereby substantially reducing overall basin benefits.
Journal Title
Water International
Conference Title
Book Title
Edition
Volume
40
Issue
5-Jun
Thesis Type
Degree Program
School
Publisher link
Patent number
Funder(s)
Grant identifier(s)
Rights Statement
Rights Statement
© 2015 Taylor & Francis (Routledge). This is an Accepted Manuscript of an article published by Taylor & Francis in Water International on 16 Jun 2015, available online: https://www.tandfonline.com/doi/10.1080/02508060.2015.1051788
Item Access Status
Note
Access the data
Related item(s)
Subject
Civil engineering
Environment and resource economics