DFIG-based Windfarm Starting Connected to a Weak Power Grid
File version
Author(s)
Sanjari, MJ
Nair, N-KC
Griffith University Author(s)
Primary Supervisor
Other Supervisors
Editor(s)
Date
Size
File type(s)
Location
Bangkok, Thailand
License
Abstract
Starting and energization of windfarms has always been done under strong grid conditions. With the increase in blackouts and desire to run parts of the system in island mode, it is necessary to examine the starting of windfarms under different system conditions. This work provides an analysis into the starting of DFIG based windfarms under weak grid conditions including using a diesel gen-set and a hydropower plant. The starting procedure of the DFIG based wind turbine has been explored afterwhich multiple wind turbines have been started simultaneously. It is assumed that the windfarm substation will have a dump load to absorb excess power produced by the windfarm. The above study is conducted using MATLAB/SIMULINK. Results shows that the type and strength of source influences the starting process of windfarm and this is necessary in determining the appropriate moment to energize a windfarm after a wide scale blackout.
Journal Title
Conference Title
2019 IEEE PES GTD Grand International Conference and Exposition Asia (GTD Asia 2019)
Book Title
Edition
Volume
Issue
Thesis Type
Degree Program
School
Publisher link
Patent number
Funder(s)
Grant identifier(s)
Rights Statement
Rights Statement
Item Access Status
Note
Access the data
Related item(s)
Subject
Electrical engineering
Electronics, sensors and digital hardware
Science & Technology
Energy & Fuels
Engineering, Electrical & Electronic
Persistent link to this record
Citation
Maina, DK; Sanjari, MJ; Nair, N-KC, DFIG-based Windfarm Starting Connected to a Weak Power Grid, 2019 IEEE PES GTD Grand International Conference and Exposition Asia (GTD Asia), 2019, pp. 153-158