The effectiveness of Hong Kong's Construction Waste Disposal Charging Scheme

No Thumbnail Available
File version
Author(s)
L. Hao, Jane
J. Hills, Martin
Tam, Vivian
Griffith University Author(s)
Primary Supervisor
Other Supervisors
Editor(s)

Jens Aage Hansen (Editor-in-Chief

Date
2008
Size
File type(s)
Location
License
Abstract

The Hong Kong Government introduced the Construction Waste Disposal Charging Scheme in December 2005 to ensure that disposal of construction and demolition (C&D) waste is properly priced to reduce such waste. The charging scheme is not only intended to provide an economic incentive for contractors and developers to reduce waste but also to encourage reuse and recycling of waste material thereby slowing down the depletion of limited landfill and public filling capacities. This paper examines the effectiveness of the charging scheme 1 year after implementation. A survey was conducted at Tseung Kwan O Area 137 and Tuen Mun Area 38, and daily C&D waste records were collected from landfills and public filling facilities between January 2006 and December 2006. The results of the survey show that waste has been reduced by approximately 60% in landfills, by approximately 23% in public fills, and by approximately 65% in total waste between 2005 and 2006. Suggestions for improving the scheme are provided. 頉SWA 2008.

Journal Title

Waste Management and Research

Conference Title
Book Title
Edition
Volume

26

Issue

6

Thesis Type
Degree Program
School
Patent number
Funder(s)
Grant identifier(s)
Rights Statement
Rights Statement
Item Access Status
Note
Access the data
Related item(s)
Subject

Environmental Management

Civil Engineering

Environmental Engineering

Persistent link to this record
Citation
Collections